Wafer Production Line
Full-automatic wafer production line features reliable performance,compact structure,small occupation,high yield,lower energy consumption,convenient maintenance,simple operation.The driven motors adopt SEW Germany, the bearings use S*F. Operating system uses PLC programing to make the process automated and easy control.Tunnel gas baking oven is main equipment for automatic wafer production line, the gas oven has excellent performance, and the main marks are:
1.Rational layout, compact structure, small space;
2.Mould Release rate is higher than (≥98%);
3.Unique energy-saving design, greatly reduce the pollution of the environment;
4.Special-form wafer biscuit plate can also be made, such as big grid, steamed twisted roll and animal design etc., according to the consumer's demands.
Output capacity of wafer production line
Plates |
27 |
33 |
39 |
45 |
51 |
63 |
75 |
Electricity |
120KW |
140KW |
160KW |
180KW |
200KW |
240KW |
280KW |
Capacity |
100kg/h |
125kg/h |
150kg/h |
175kg/h |
200kg/h |
250kg/h |
300kg/h |
Plates |
27 |
33 |
39 |
45 |
51 |
65 |
75 |
LPG |
13kg/h |
15kg/h |
19kg/h |
23kg/h |
27kg/h |
32kg/h |
37kg/h |
Capacity |
100kg/h |
125kg/h |
150kg/h |
175kg/h |
200kg/h |
250kg/h |
300kg/h |
ABOUT TARGET INDUSTRY
Shanghai Target Industry Co., Ltd is a quality-oriented factory and we are always in the leadership position in the confectionery,bakery industry. So far we have exported machines to more than 100 countries, including North America, Europe, the Middle East, South Africa, Asia, etc. Relying on the good quality and satisfying services, We have gained a good reputation and popularity, especially in the North American market.
Our factory was built in 1972. It has evolved from a state-owned confectionery factory to one with four modern workshops and one CNC center, along with 200 employees. The total area is more than 20,000 square meters. In terms of land occupancy and the number of employees, we are the biggest one in Shanghai.
DELIVERY DATE:
Within 60 working days after the receipt of the down payment.
TERMS OF PAYMENT:
50% by T/T as deposit and the balance shall be paid by T/T before delivery.
THERS: Testing & training:
The plant layout design, assembling and installation, start-up and local team training will be charge if the machine is exported, the buyer should be responsible for the round-trip tickets, local transportation, board & lodging and US$200.-/day/person shall be paid as pocket money to our technicians. There should be one or two persons and it will cost about 7-15 working days.
WARRANTY:
The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts at the seller's cost (FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
UTILITIES:
The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.
VALIDITY:
This offer is valid for 30 days.
Contact Information:
Jacky Geng / Project Manager
Solutions for food and packing machines.
Shanghai Target Industry Co., Ltd.
Thanks & Best regards!