Gd80 Automatic Gummy Candy Depositing Machine and Production Line

Product Details
Customization: Available
Certification: CE, ISO9001
Power Source: Electric
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 30 foreign trading staff(s) and 20 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Gd80 Automatic Gummy Candy Depositing Machine and Production Line
  • Gd80 Automatic Gummy Candy Depositing Machine and Production Line
  • Gd80 Automatic Gummy Candy Depositing Machine and Production Line
  • Gd80 Automatic Gummy Candy Depositing Machine and Production Line
  • Gd80 Automatic Gummy Candy Depositing Machine and Production Line
  • Gd80 Automatic Gummy Candy Depositing Machine and Production Line
Find Similar Products

Basic Info.

Model NO.
GD80
Process
Thermal Processing
Automatic Grade
Automatic
Application
Candy
Customized
Customized
Transport Package
Wooden Packing
Specification
600kg/hr
Trademark
shanghai target
Origin
Shanghai
HS Code
84382000
Production Capacity
1pic/Momth

Product Description

Gd80 Automatic Gummy Candy Depositing Machine and Production LineGd80 Automatic Gummy Candy Depositing Machine and Production LineGd80 Automatic Gummy Candy Depositing Machine and Production Line

Gd80 Automatic Gummy Candy Depositing Machine and Production Line

DELIVERY DATE:

Within 60 working days after the receipt of the down payment.

TERMS OF PAYMENT:

50% by T/T as deposit and the balance shall be paid by T/T before delivery.

OTHERS: Testing & training:

The plant layout design, assembling and installation, start-up and local team training will be charge if the machine is exported, the buyer should be responsible for the round-trip tickets, local transportation,  board & lodging and US$100.-/day/person shall be paid as pocket money to our technicians. There should be one or two persons and it will cost about 7-15 working days.

WARRANTY:

The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts at the seller's cost (FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.

UTILITIES:

The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable  to be connected to our machinery before the arrival of our machinery.
Yours Sincerely

Jacky Geng









 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier