• Candy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop Candy
  • Candy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop Candy
  • Candy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop Candy
  • Candy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop Candy

Candy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop Candy

After-sales Service: Provided
Warranty: 3years
Certification: CE, UL, ISO9001
Power Source: Electric
Process: Concentration and Dry
Automatic Grade: Automatic
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
GD80
Application
Candy
Customized
Customized
Transport Package
Wooden Case
Specification
CE
Trademark
SHANGHAI SHINWEI MACHINERY
Origin
China Shanghai
HS Code
84382000

Product Description

Candy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop Candy
Candy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop CandyCandy Depositing Machine Line for Gummy Candy &Hard Candy & Toffee & Lollipop Candy

DELIVERY DATE:

Within 60 working days after the receipt of the down payment.

TERMS OF PAYMENT:

50% by T/T as deposit and the balance shall be paid by T/T before delivery.

OTHERS: Testing & training:

The plant layout design, assembling and installation, start-up and local team training will be charge if the machine is exported, the buyer should be responsible for the round-trip tickets, local transportation,  board & lodging and US$100.-/day/person shall be paid as pocket money to our technicians. There should be one or two persons and it will cost about 7-15 working days.

WARRANTY:

The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts at the seller's cost (FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.

UTILITIES:

The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable  to be connected to our machinery before the arrival of our machinery.

 Yours Sincerely

Jacky Geng



 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now